DESIGN AND CONSTRUCTION OF GAZİANTEP MECHANICAL BIOLOGICAL TREATMENT AND BIOGAS PRODUCTION FACILITY - CAPACITY INCREASE (2ndSTAGE), COMBINED HEAT and POWER (CHP) UNIT AND REFUSE DERIVED FUEL (RDF) PRODUCTION UNIT

İhale Yayını Başlangıç-Bitiş Tarihi: 04/04/2024 - 22/04/2024